With the posts in place and the majority of the terrace levelled, Diego Arias and Carlos Castillo checked that all was going well.  When all posts were securely put in place, a friend of the garden, Gustavo Ledesma and I, along with the help of some BGVs, helped put up the roof structure.

Posts in place
Carlos and Aurelio checking posts and removing wooden supports from holes

 

Posts in place

 

The terrace before any of the roof structure was put in place.

 

 

 

Phase three – checking posts and levelling