We are finally beginning to see progress on the construction of the greenhouse.

The structure is finally up! and this was done quickly. After our last meeting the funding for the Greenhouse Project was approved by Dr J. Nagy and a provider was found that could do the necessary soldering and metalwork to produce our structure. This structure was defined between Sara, Gabriela and Melissa, the school engineer and myself. This was delivered in January 2022.

Prior to this the site was surveyed where the structure was going to be set up and staked out. Foundations were dug and poured with cement, kindly donated by Reinel Moreno, father of Alejandro Moreno, one of my 10th grade students this year.

We now are looking for a provider for the anti-trip netting that we shall use to cover the structure.

The site being surveyed with the school engineer and contractor to stake out the site and dig foundations.
The location of the new greenhouse
Dr Waliszewski measuring the width of the greenhouse with Sara Escobar.

Planning out the location of the greenhouse with Sara, Melissa and Gabriela.

                                             Foundations dug on the site of the future greenhouse.
Roof struts for the “greenhouse”. We asked for the metal to be painted Green, so that we had a GREENHOUSE
Metal joists and pillars for the greenhouse construction
             Melissa Londoño, Sara Escobar and Dr Wojtek Waliszewski with the structure of the greenhouse in place.
THE GREENHOUSE PROJECT – CONSTRUCTION and WORKS