With the main structure now finished all that is left to do is to add netting to the sides and to the roof, cement the netting in, so that animals cannot get into the terrace and add a door.




The school´s gardeners helped with putting up the netting and adding cement to the structure. We also discovered that we needed support trusses to push in the plastic posts as the weight of the roof was pushing them outwards. These were added by students.

A door was added to the structure and finally we added some extra bamboo poles to support the roof structure, raising it slightly.
Phase five – cement, netting and a door