In order to re-build the terrace we first had to breakdown what we already had. That meant dismantling the existing rock wall, weeding by digging weeds into the earth and levelling the terrace. This work took lots of weeks, lots of class time, was hard but incredibly rewarding.

 

 

The terrace after being left fallow for a year.
Removing rocks from the terrace wall. This took a long time.
The terrace after having rocks removed

 

Huge piles of stones that made up the original terrace wall were piled up next to the Mango tree.

Phase one – complete!

 

 

 

 

 

 

 

 

Phase one – breaking down the terrace wall

Leave a Reply

Your email address will not be published. Required fields are marked *

Scroll to top