The Top Path project is being managed by Manuela, Nick Nasser and Martin. They are in charge of constructing a path that will run for about 15 m from the first to the second tank and to the compost bins: it will measure about 1m in width.
To date they have staked out the path after determining the level and brought wooden planks up to the area in order to set it out. It will be cut into the slope and secured with the aforementioned planks staked into the ground. It will also be leveled using soil that is cut from above the path.
In the future, when development of the new gymnasium has finished and the metal fencing removed, we plan to plant and grow tropical fruit trees above the path as a live fence.

Dr Waliszewski talking to Nick Nasser, Martin and Manuela (seated) about the design of the pathway. The second water tank can be seen in the background.
