Work on the top path is in the hands of Christian, Andres “Billy” Felipe, Juan Mario and Nick N. They have been using the cement filled bottles with wooden planks (that were salvaged from the Limoncillo Car Park) to form a foundation for wooden planks that are interlinked in a herringbone fashion. This is hard work, and they have had to revise how they construct the foundation for the path.  The path is coming along. The path is being made level, with the soil being moved from the top edge to fill in the space between path and wooden planks.

Nick N and Chrisitan working on the top path near the far tank. The compost area is planned to be placed just below the path, beneath the shade of the tree.

Manuela holding a plank of wood whilst Juan Mario digs a hole.

Christian and Juan Mario about to put a cement filled plastic bottle in place. This acts as a guide for the wooden planks which are interwoven between them.

The top path under construction. The photo does not do justice to the slope experienced here. Nick N, Christian and Juan Mario.

The top path continues